Desktop Meter Station (2100)

Flexible Meter Testing, Warm-Up, and Validation Platform for Utility Applications

The TESCO Model 2100 Desktop Meter Station is a versatile meter testing platform used by utilities, meter shops, and engineers to energize, condition, and validate electric meters prior to deployment.

With thousands of units deployed across North America, the 2100 has supported AMI and AMR meter validation, communications testing, and pre-deployment verification workflows.

Commonly used as a flexible warm-up solution, the 2100 allows users to apply voltage and load, perform communications testing, and evaluate meter performance under controlled conditions.

SKU: 2100 Category:
×

Description


What the 2100 Is Used For

The Model 2100 supports a wide range of meter testing and validation applications, including:

  • Meter warm-up and conditioning under energized load
  • Pre-deployment meter validation
  • AMI and AMR communications testing (including PLC capabilities)
  • Basic configuration verification and troubleshooting
  • Disconnect testing and operational checks
  • Engineering evaluation and troubleshooting

 

Why Utilities Use the 2100

Utilities use the 2100 Desktop Meter Station to:

  • Identify meter issues before field installation
  • Validate PLC communications without additional external equipment
  • Reduce failed installations and unnecessary truck rolls
  • Support both lab and meter shop environments
  • Provide a flexible platform for multiple meter testing scenarios

 

Key Features and Capabilities

  • Voltage Selectable: 120/208/240/277 VAC standard; up to 480 and 600 VAC optional
  • Load Configurations:
    • Internal load (phantom)
    • External load up to 50 amps
    • Built-in load options (0, 5, 30 amps)
  • PLC Communications Testing: No additional external equipment required for PLC testing
  • Disconnect Testing Capability
  • Reverse Current Testing Option
  • Supports All Standard Meter Forms

 

Designed for Real-World Utility Workflows

The 2100 is designed for both:

  • Meter shops performing validation and setup
  • Engineering environments requiring flexible test configurations

Its compact footprint makes it ideal for bench-top use while still providing the functionality needed for field-relevant meter testing scenarios.

Specifications

 

Standard Specifications
Standard Meter Forms All standard meter forms available
Voltage Voltage Selectable: 120/208/240/277 VAC;
347, 480 and 600 VAC optional
Custom voltages available
Dimensions 12” x 10” x 11” (W x H x D)
12” x 10” x 13” (W x H x D, Disconnect and built-in load models)

 

Customization and Configuration Options

The 2100 can be configured based on your testing needs:

  • Voltage requirements (including Canadian configurations up to 600V)
  • Load profiles and test conditions
  • Communication testing capabilities
  • Disconnect and reverse current functionality

FAQs


A meter warm-up board is used to apply voltage and load to energize meters, allowing for conditioning and basic validation prior to deployment. Systems such as TESCO’s 2100 Desktop Meter Station are commonly used for this purpose in utility environments.

Yes, meter warm-up systems can apply voltage and load using internal, external, or built-in configurations. Solutions like the TESCO 2100 and 2199 allow utilities to simulate real-world meter operating conditions during testing.

Yes, many meter testing systems support Power Line Carrier (PLC) communications testing. For example, systems like the TESCO 2100 and 2199 enable utilities to verify meter communication performance without requiring additional external equipment for PLC testing.

Basic warm-up boards are ideal for flexible testing environments and lower-volume meter validation. Systems like the TESCO 2100 are often used for conditioning and basic verification, while more advanced platforms such as the 2199 or MQB systems are better suited for automated or high-throughput workflows.

Yes, meter testing equipment can apply service voltage without load to observe meter behavior. While systems like the TESCO 2100 can support basic observation, more advanced platforms such as the 2199 Meter Qualification Board are better suited for controlled testing environments.

Product Documents


Product Videos


Remote Disconnect Meter Test - 2S Meter

Remote Disconnect Meter Test - 2S Meter

Top Best Sellers

Disclaimer:

TESCO Metering reserves the right to modify product designs, specifications, features, and documentation at any time as part of our continuous improvement process. All information is provided “as is” and may change without prior notice. While TESCO® strives for accuracy, completeness, and technical reliability, customers should verify the latest product details before making purchasing or engineering decisions. For confirmation of current specifications or application suitability, please contact TESCO® directly.