Meter Test Board (MTB3) – True Three-Phase Meter Testing System

The TESCO MTB3 Meter Test Board is a true three-phase testing system designed for electric utilities to perform advanced meter testing, validation, and diagnostics under real operating conditions.

Built on TESCO’s NextGen platform, the MTB3 applies true three-phase voltage and current to fully energize meters, enabling accurate testing of modern AMI meters, complex meter forms, and advanced functionality.

What is a True Three-Phase Meter Test Board?

A true three-phase meter test board applies independent voltage and current to all phases, allowing utilities to test meters exactly as they operate in the field.

This enables:

  • Accurate testing of polyphase and complex meter forms
  • Validation of phase relationships and load conditions
  • Advanced functional and communications testing
SKU: MTB3 Category:
×

Description


Key Features and Capabilities

True Three-Phase Testing

  • Applies true three-phase voltage and current to meters
  • Independent phase control enables precise phase-by-phase validation
  • Fully energizes meters under real operating conditions
  • Supports modern AMI and advanced meter types

Advanced Meter Testing Capabilities

The MTB3 supports:

  • Accuracy testing
  • Functional testing
  • Qualification testing
  • Demand and runtime testing

Sequence Testing & Automation

  • Automated test sequences for repeatable results
  • Configurable test setups
  • Reduced operator intervention

Communications & PLC Testing

  • Power Line Carrier (PLC) testing capabilities
  • Communications validation for AMI meters
  • Real-world communications simulation

Disconnect Testing

  • Test meter disconnect functionality under load
  • Validate meter switching performance
  • Simulate field conditions

User Interface & Control

  • Integrated display and control interface
  • PC software interface via Ethernet
  • Manual and automated testing modes

Modular & Scalable Design

  • Configurable multi-rack system architecture
  • Expandable based on utility requirements
  • Each rack operates as a self-contained unit

Applications


The MTB3 is used by utilities for:

  • Advanced meter testing and validation
  • Polyphase meter testing
  • AMI meter qualification and diagnostics
  • Communications and PLC testing
  • Meter certification and compliance testing
  • Engineering and lab-level testing

What Makes the MTB3 Different?

The MTB3 is designed for modern meter testing challenges, where basic testing is no longer sufficient.

By providing:

  • True three-phase energization
  • Automated sequence testing
  • Integrated communications validation

The MTB3 allows utilities to fully validate meter performance before deployment, reducing risk and improving system reliability.

Not sure whether a full series-parallel or true three-phase system is right for your application? The comparison below highlights the key differences.

MTB3 vs. Series-Parallel Meter Test Boards (MTB1)

Feature MTB3 MTB1
Testing Approach True three-phase (independent control) Series-parallel
Phase Control Independent per phase Shared across phases
Testing Accuracy Context Phase-specific validation General accuracy testing
Sockets per Module 1 2
Max Sockets per Chassis Up to 3 Up to 6
Best Use Case Polyphase & advanced testing High-volume testing
Application Focus Engineering / validation Production meter shop

 

Looking for full series parallel testing? Explore the MTB1 Meter Test Board.

Contact TESCO to discuss your testing requirements and configure an MTB3 system for your meter shop or lab environment.

FAQs


A true three-phase meter test board applies independent voltage and current to all phases, allowing accurate testing of polyphase meters under real operating conditions.

MTB1 is a full series-parallel test board for high-volume meter shop testing, while MTB3 provides true three-phase testing for advanced meter validation and engineering applications.

Yes. The MTB3 supports AMI meter testing, including communications, PLC testing, and functional validation.

The MTB3 can perform accuracy testing, sequence testing, PLC testing, disconnect testing, and advanced functional testing.

Product Documents


Top Best Sellers

Disclaimer:

TESCO Metering reserves the right to modify product designs, specifications, features, and documentation at any time as part of our continuous improvement process. All information is provided “as is” and may change without prior notice. While TESCO® strives for accuracy, completeness, and technical reliability, customers should verify the latest product details before making purchasing or engineering decisions. For confirmation of current specifications or application suitability, please contact TESCO® directly.