Meter Engineering Board 1 (MEB1), Series-Parallel Meter Engineering Board for Advanced Functional and Load Testing

The TESCO MEB1 Meter Engineering Board is a series-parallel, multi-position system designed for advanced functional validation and engineering-level testing of electric meters.

With engineering-grade metrology (~0.1% accuracy), the MEB1 enables utilities to perform load-based testing, demand validation, and comparative analysis across multiple meters—bridging the gap between basic functional testing and full accuracy calibration.

What is a Meter Engineering Board?

A meter engineering board is used to evaluate how electric meters perform under load and over time, including demand behavior, time-of-use operation, and overall meter response.

  • Unlike meter qualification boards, MEB systems:
  • Include basic metrology (~0.1%)
  • Support load-based and comparative testing
  • Provide deeper insight into meter performance
SKU: MEB1 Category:
×

Description


Meter Performance Validation Under Load

The MEB1 is designed to evaluate how meters perform under real operating conditions by running tests over time and under varying load levels.

This includes validating:

  • Demand calculations
  • Time-of-use performance
  • Meter response under sustained load conditions

With approximately 0.1% accuracy, the MEB1 provides engineering-level validation to confirm that meter performance is consistent and within expected operating ranges—without requiring revenue-grade calibration.

Key Features and Capabilities

Series-Parallel Testing Architecture

  • Single-phase voltage applied across all stabs
  • Series current across phases
  • Multi-position testing for increased throughput

Engineering-Level Meter Testing

  • Run baseline meter accuracy tests
  • Perform demand and time-run testing
  • Compare meter performance under varying load conditions

Engineering-Grade Metrology

  • Accuracy: approximately 0.1%
  • Supports comparative performance validation
  • Not intended for revenue-grade calibration

Functional & Communications Testing

  • Firmware and configuration validation
  • Communications testing and verification
  • Disconnect and operational testing

Waveform & Load Simulation

  • ANSI C12.20 waveform generation
  • Dropped cycle testing
  • Variable load conditions

Flexible System Design

  • Modular, multi-position rack configuration
  • Expandable system architecture
  • PC-based control interface

Applications


  • Engineering-level meter validation
  • Demand and time-of-use testing
  • Comparative meter performance analysis
  • Load-based testing under varying conditions
  • Pre-certification validation workflows

What Makes the MEB1 Different

The MEB1 is designed for utilities that need to validate how meters behave under load at scale.

By combining:

  • Series-parallel architecture
  • Multi-position testing
  • Engineering-grade metrology (~0.1%)

The MEB1 enables utilities to perform high-throughput performance validation and engineering-level testing before calibration or deployment.

MQB1 vs MEB1 vs MTB1

Feature MQB1 MEB1 MTB1
Purpose Functional validation Engineering validation Accuracy testing
Metrology None ~0.1% (engineering-grade) 0.04%+
Testing Depth Basic Moderate High
Load Testing Limited Advanced Advanced
Throughput High High High
Best Use Verify operation Validate behavior under load Certify accuracy

 

Contact TESCO to configure an MEB1 system for advanced meter validation and high-throughput engineering testing.

FAQs


A meter engineering board is used to evaluate meter performance under load, including demand, runtime, and operational behavior.

The MEB1 includes basic metrology (~0.1%) for engineering validation but is not intended for revenue-grade calibration.

The MEB1 supports baseline accuracy checks, demand testing, time-run testing, and comparative performance validation under varying load conditions.

Use MEB1 when you need deeper validation of meter behavior under load, not just basic functional verification.

Product Documents


Top Best Sellers

Disclaimer:

TESCO Metering reserves the right to modify product designs, specifications, features, and documentation at any time as part of our continuous improvement process. All information is provided “as is” and may change without prior notice. While TESCO® strives for accuracy, completeness, and technical reliability, customers should verify the latest product details before making purchasing or engineering decisions. For confirmation of current specifications or application suitability, please contact TESCO® directly.